Level 2 in the garage or on the driveway, wired to a circuit that can actually carry it.
The install itself is straightforward. What decides the price is the run from the panel and whether the panel has the capacity, so we look at both before quoting rather than after.
If the panel is full, a load calculation often shows you can still do it without a full upgrade. We will run that first, because it is the difference between a few hundred dollars and a few thousand.
What that usually includes
- Load calculation before we quote, not after
- Hardwired or a NEMA 14-50, whichever suits your car
- Conduit run neatly, not stapled across the garage wall
- Permit and inspection included
What it costs
Quoted after we see the panel and measure the run. No guessing over the phone.
Where we do it
Spokane, Spokane Valley, Liberty Lake, Cheney, Deer Park and Airway Heights.